Construction Work up to 2007
|
|
|

Campbell Engine now in position outside museum entrance1353 viewsThe 40 ton Campbell has now been put back together as a gate guardian
|
|

Another delivery of concrete for the floors arrives1476 views
|
|

Trees down the drive need to be taken down to widen the area1826 views
|
|

Work on widening the drive and entrance area before new surface laid1530 views
|
|

Work on laying new surface on drive area1240 views
|
|

Outside shell goes up1354 views
|
|

New surface for drive entrance1352 views
|
|

Most of the buildings metal supports in place1267 views
|
|

Front wall brickwork going up1218 views
|
|

Blocks ready to be go in place1239 views
|
|

Work on bringing the steam engine building up to scratch1204 views
|
|

Front of steam engine building given a new look to match the new building1227 views
|
|
|